Home & Small Business
System arrangements and applications


 

Home & Small Business storage solutions System arrangements and control APPs
Depending on the existing system arrangement, various applications and functions (APPs) are available for operation. With the ADS-TEC tool Big-LinX® Simulation, the individual design and function can be simulated in advance. Your dealer would be happy to advise you during planning.

Use Case 1 Storage as a network component
Possible use case
• Connection power limitation

Connection:
• Power supply: 400V AC three-phase, 32A site secure
• PV input: not used
• Emergency: not used
• RS-485: Connection of the power meter

Use Case 2 Storage with emergency function
Possible applications:
• Connection power limitation
• Emergency function

Connection:
• Power supply: 400V AC three-phase, 32A site secure
• PV input: not used
• Emergency: 400V AC three phase, in SRS2025 fused with 32A and FI
• RS-485: Connection of the power meter

Use case 3 Storage with PV plant
Possible applications:
• Connection power limitation
• Connection power limitation
• self-consumption

Please note:
• If PV power plus SRS2025 performance 30kVA exceeds, then ENS is externally necessary 20kVA + ____ kWp> 30 kVA

Connection:
• Power supply: 400V AC three-phase, 32A site secure
• PV input: not used
• Emergency: not used
• RS-485: Connection of the power meter

Use case 4 Storage with PV plant and Emergency function
Possible applications:
• Connection power limitation
• Emergency function
• Connection power limitation
• self-consumption

Please note:
• If PV power plus SRS2025 performance 30kVA exceeds, then ENS is externally necessary 20kVA + ____ kWp> 30 kVA

Connection:
• Power supply: 400V AC three-phase, 32A site secure
• PV input: not used
• Emergency: 400V AC three phase, in SRS2025 fused with 32A and FI
• RS-485: Connection of the power meter

Use case 5 Storage with directly connected PV system and emergency function
Possible applications:
• Connection power limitation
• Emergency function
• Connection power limitation
• self-consumption

Please note:
• If PV power plus SRS2025 performance 30kVA exceeds, then ENS is externally necessary 20kVA + ____ kWp> 30 kVA

Connections at SRS2025:
• Power supply: 400V AC three-phase, with 32A secure site
• PV input: 400V AC three phase, for PV systems up to 20kWp site fit hedge
• Emergency: 400V AC three phase, in SRS2025 fused with 32A and FI
• RS-485: Connection of the power meter

Use case 6 Storage as a network component with an external ENS
• Connection power limitation
• Emergency function at the grid connection

Connection:
• Power supply: 400V AC three-phase, with 32A secure site
• PV input: is not required and must are not used
• Emergency: is not required and must are not used
• RS-485: Connection of the power meter
• ENS: for voltage measurement and ENS-On control / feedback to / from SRS2025

Use case 7 Storage with PV plant and Emergency function
Possible applications:
• Connection power limitation
• Emergency function at the grid connection
• Connection power limitation
• self-consumption

Connection:
• Power supply: 400V AC three-phase, with 32A secure site
• PV input: is not required and must are not used
• Emergency: is not required and must are not used
• RS-485: Connection of the power meter
• ENS: for voltage measurement and ENS-control / feedback to / from SRS2025